How to Prepare a Property for Renovation Before Moving to Spain


The safest way to prepare is to settle the paperwork and the building’s hidden condition first, then agree a written scope, permit route and payment schedule with one contractor who manages every trade, and only then fix a move-in date. Renovations in Spain rarely go wrong on the visible finishes. They go wrong on what nobody checked beforehand: a missing licence, a leaking pipe behind new tiles, a permit of the wrong type. If you will be abroad while the work happens, a local company such as URU Reformas, which manages full and partial renovations in Torrevieja and the Vega Baja, takes the coordination off your hands.
Key Takeaways
Check the legal status of the property (Land Registry, Cadastre, licences, occupancy certificate) before you spend on works.
Inspect hidden services and damp first. Finishes come last.
Get the permit route right: minor works and major works are treated very differently in the Valencian Community.
Work from itemised quotes, a written contract and milestone payments, with a retention until snags are fixed.
Build your move-in date around the programme, with contingency in both time and money.
Table of Contents
Step 1: Check the property’s legal position
Before you commit money to works, confirm that the Land Registry entry, the Cadastre (the state property map and register) and the physical building all match. Extensions, enclosed terraces and outbuildings are the usual mismatches. According to an architects’ guide to buying near Alicante, you should also ask the town hall whether any planning infringement proceedings are open, check that additions were built with a licence or can legally be regularised, and confirm that the home has, or can obtain, its occupancy licence. That licence matters because utility contracts and future sales depend on it.
If you have not yet completed the purchase, our own guide to four checks before buying a property to renovate goes through the order to follow. If you already own the property, the same checks tell you what the renovation can and cannot include.
Pro Tip: coastal homes carry extra layers. Expat Focus notes that the Coastal Law restricts building within 100 m of the shore in rural areas and 20 m in towns, and that environmental assessments can lengthen timelines. If your property is near the sea, raise this before you plan a programme.

Step 2: Inspect what you cannot see
A fresh coat of paint says nothing about the wall behind it. Reno Pro recommends collecting the flat’s records and any relevant community minutes, then briefing a technician on your intended changes and your move-in date, so that you receive a prioritised written report separating observed defects, likely causes and anything needing a specialist.
In our experience as a renovation company, the areas worth opening up first on the Costa Blanca are:
Damp and waterproofing: terraces, roofs, party walls and ground-floor rooms.
Plumbing: old supply pipes, drains, water heaters and signs of past leaks.
Electrics: the consumer unit, circuit layout, earthing and the age of the wiring.
Structure and façade: cracks, rusting reinforcement, loose render.
We handle leak detection and plumbing and electrical installations and repairs in-house, so findings from the survey can be priced as part of the same programme. For older homes, what to check before renovating an older property in Alicante lists the usual problem points.
Step 3: Decide the order of work
The order matters as much as the budget. A Spanish technical blog sets out the sequence that avoids mid-project cost rises: anything affecting safety or structure first, then hidden services and damp, then insulation and windows, and finishes last. A concealed pipe repair after a new tiled wall can undo completed work, so a measured layout and a checked services plan before demolition reduce rework.
Phase | What it covers | Why here |
1. Safety and structure | Structural repairs, asbestos if present | Everything else depends on it |
2. Hidden services and damp | Plumbing, electrics, waterproofing | Must be done before walls and floors close |
3. Envelope | Insulation, windows, façade, roof | Protects the finished interior |
4. Finishes | Plastering, tiling, kitchen, bathroom, carpentry, painting | Last, so nothing is damaged |
A partial renovation follows the same logic. If you only plan a new bathroom, the plumbing and waterproofing still come before the tiles.
Step 4: Choose the permit route
In the Valencian Community, the permit depends on the type of work. As e-architect explains, minor works such as new kitchens, bathrooms, flooring, painting and window replacement without changing openings are often handled through a declaración responsable, a sworn statement to the town hall that lets work start without waiting for prior approval. The Ministry of Housing’s 2025 good-practice guide on planning licences describes the mechanism in the same terms.
Major works that affect structure, façade, volume or layout need an architect-signed project and a building licence before work starts. The town hall also charges the ICIO (a construction tax) and licence fees, calculated on the works budget, so include them from day one. Misclassifying structural work as minor can lead to fines, stop orders and, in the worst cases, demolition orders.

This is a step the town hall decides, not you, and we deal with it as part of the project. Our guide to which renovation permits are required in Alicante covers the cases in more detail, and renovating from abroad: when walls need approval is the one to read if you plan to move walls.
Step 5: Set a realistic budget
Idealista’s September 2026 estimates for a full renovation in Spain are €700 to €850 per m² for basic quality, €850 to €1,000 for medium and €1,000 to €1,300 for high quality, with kitchens and bathrooms typically taking the largest share. For a 70 m² flat, those figures work out at roughly €59,500 to €70,000 at medium quality, before permits.
Two habits keep a budget honest:
Split the envelope. A 2026 buyer guide illustrates a €30,000 works budget as €22,000 for the contractor (VAT included), €3,000 for professional fees and permissions and €5,000 for contingency.
Ask for itemised, phased quotes. A lump sum hides scope. We provide free detailed phased quotes, so you can see what each trade costs and decide what to do now and what to leave for later.
For local figures, see our guides on budgeting for a home renovation in Spain, bathroom renovation costs in Alicante and kitchen budgets in Alicante.
Step 6: Plan the timeline around your move
Durations depend on scope. One published guide suggests that a full kitchen renovation with a new layout takes about 3 to 5 weeks and a full renovation of a 70 to 90 m² property about 6 to 10 weeks, with structural work taking longer. Treat those as a range, not a promise, and add time for permits, which vary by town hall, and for deliveries of made-to-measure items.
In practice:
Fix your move-in date only after the contractor has given a written programme.
Keep a buffer of several weeks between planned completion and arrival, so that snagging does not happen with your furniture already in.
Book your flights for handover, not for the start of works.
If the property is a second home you use seasonally, schedule the noisy work for the months you will be away.
Step 7: Choose who manages it, especially if you live abroad
If you are not in Spain full-time, someone has to be on site for you. Expat Focus advises appointing a project manager in that case, and checking the builder’s tax registration (a valid CIF or NIF), proof of public liability insurance and, for major structural work, the ten-year structural warranty required under Spanish building law.
A good written contract should state:
The scope, materials and specification, item by item.
The programme, with milestones.
Payments linked to verified milestones, never the full sum in advance.
A retention held back until snags are resolved. One Spanish architects’ practice suggests 20 to 30% at signing, staged payments and 5 to 10% held for 3 to 6 months after completion.
The same sources list the common risks for owners without representation: cheaper substitute materials, undeclared subcontractors, scope creep without a written agreement, work without the correct licence and no habitation certificate on completion. A single contractor that manages all trades under one contract removes most of these. We coordinate plumbing, electrics, carpentry, painting and plastering ourselves and send overseas owners regular photo and video updates, so you can follow progress from home. If you want help shortlisting, our guide on choosing a renovation company in Torrevieja sets out the criteria.
If you grant someone power of attorney to act for you, KwiCo notes that it must be signed before a notary in your home country and apostilled under the Hague Convention to be valid in Spain. Allow time for this before you travel back.
Step 8: Check the handover before you move in
Before you release the final payment, walk the property with the contractor and a written snag list. Check that:
Every tap, drain and shower runs without leaks, and the water heater works.
Every circuit and socket works, and the consumer unit is labelled.
Doors, wardrobes and kitchen units open and close correctly.
Paint, tiling and flooring are finished to the agreed specification.
Air conditioning works in every room.
You hold the guarantees, the electrical and plumbing documentation and the habitation certificate where required.
It also helps to run the water for a few days before you arrive, so a slow leak shows itself while the contractor is still engaged.
Where URU Reformas fits
We renovate homes in Torrevieja, Orihuela Costa, Ciudad Quesada and across the Vega Baja, covering full renovations, extensions, kitchens, bathrooms, façades and roof waterproofing as well as plumbing, electrics, carpentry, painting and interior design under one roof. Our positioning is guaranteed pricing, deadlines and quality, with insurance and regulatory compliance handled from start to finish. Consultations are free, and every quote is detailed and phased. To start with a quote for your property, contact us.

Our perspective
Owners who prepare well tend to do three things: they find out what the building is before they decide what it should become, they keep one party responsible for every trade, and they write the programme down before they book the removal van. The costliest surprises are behind finished surfaces: damp, old pipework, ageing wiring. That is why we begin with the hidden services and waterproofing and leave finishes to the end, and why we give quotes in phases, so every decision is visible. For clients living abroad, our approach is simple: one team, one contract, clear communication in English and regular photo and video updates, so the home you arrive in is the one you planned. URU Reformas
FAQ
Do I need a licence to renovate a flat in Spain?
Yes, in some form. In the Valencian Community, minor works such as a new kitchen or bathroom are often handled through a declaración responsable, while structural, façade or layout changes need an architect-signed project and a building licence. The town hall also charges ICIO and licence fees. We handle the permit route as part of the project.
Should I renovate before or after moving to Spain?
Before, if the home is habitable only after the work. Safety, services and damp work should be finished before you arrive, because living in a building site slows everything down. Plan the move-in date from a written programme, with a buffer for snagging.
Can I manage a renovation in Spain from abroad?
Yes, with a single contractor who manages all trades and sends regular photo and video updates, a written contract and milestone payments. If you appoint someone to act for you, a power of attorney signed before a notary and apostilled is needed to be valid in Spain.
What should I renovate first?
Start with safety and structure, then hidden services (plumbing, electrics) and damp, then insulation and windows. Finishes such as tiling, kitchens and painting come last, so they are not damaged or redone.